CA INTERNATIONAL · SERVICE AREAS
Hatay Private Security
In the project requests in Hatay, we are based on the current access conditions and areas used of the facility. We do the initial assessment with up-to-date field knowledge, not with old address or settlement assumptions.

On-site verification of current use
Entry location, active buildings, and contractor workspaces are controlled together in discovery. Duty limits for unused sections are also set. Security service does not substitute for structural safety review, technical compliance, or occupational safety assessment.
Making current field knowledge the basis of the proposal
Project requests in Hatay should have up-to-date knowledge of existing entrances, used buildings, and accessible roads. Previous photo or address registration alone is not considered sufficient. With areas not used in on-site assessment, service requested areas are separated and the task limit of security personnel is clearly defined.
Transfer of the technical finding to the relevant expert
If there is an access barrier or technical problem in the field, it is determined which facility unit to report it to. Safety observation should not be presented as a structural fitness review. The current purpose of use of the facility at the time of application and the sharing of ongoing work prevents the incorporation of technical expertise with the security service.
Frequently Asked Questions
Is the old facility plan enough for the application?
The old plan may provide initial information; however, changing entries and unused areas must also be specified. The final task plan is prepared after the current field conditions are confirmed.
Can a final offer be prepared through the old settlement plan?
Current conditions must be verified. Active areas and access changes should not be assumed to be finalised without being seen.